Limit this search to....

Investigation of Riser Disconnect and Spill Green Canyon Block 652 OCS-F 21810
Contributor(s): U. S. Department of the Interior (Author)
ISBN: 1503327884     ISBN-13: 9781503327887
Publisher: Createspace Independent Publishing Platform
OUR PRICE:   $15.19  
Product Type: Paperback - Other Formats
Published: January 2015
Qty:
Additional Information
BISAC Categories:
- Reference | Research
Physical Information: 0.07" H x 8.5" W x 11.02" (0.24 lbs) 36 pages
 
Descriptions, Reviews, Etc.
Publisher Description:
On July 5, 2005, an unplanned riser disconnect was initiated on the Ensco 7500 semi-submersible rig, which had been engaged in exploratory drilling activities, because of unfavorable sea and wind conditions associated with an approaching tropical depression. While the riser volume was being displaced with seawater in preparation for the disconnect operation, the rig was no longer able to maintain station adequately enough to complete the operation. As a result, the riser was disconnected from the Lower Marine Riser Package (LMRP), at which time 710 barrels of synthetic-based mud was released from the riser into the GOM. At the time of the disconnect, there were no open hole hydrocarbons exposed below the casing depth.